Product views, process and real results
iKoffy EdiBot Handheld Edible Food & Cookie Printer
Print your own designs directly onto cookies.
Your EdiBot Set
- Direct printing on compatible foods
- Full-color edible printing
- Create with HomeSpark
- Kosher-certified edible ink
Why EdiBotCore benefits
- Personalize your favorite treats
- Print photos, names and drawings on compatible food surfaces.
- Create with HomeSpark
- Upload a photo, capture a drawing or explore AI-assisted designs in the app.
- Print in full color
- Bring colorful designs to suitable foods and edible decorations with EdiBot Ink Pods.
- Print where you bake
- Move the compact wireless printer between your kitchen counter and baking workspace.
- Make treats to share
- Personalize birthday cookies, party favors and gifts.
Good to KnowInk, care & support
- Kosher-certified edible ink
- EdiBot uses food-grade CMYK edible ink.
- Print directly on supported surfaces
- Print directly on smooth, dry royal icing and other compatible surfaces. You can also print on an edible sheet to decorate a treat.
- No design experience needed
- Prepare your artwork in the HomeSpark app.
- Replaceable Ink Pods
- Swap in a compatible EdiBot Ink Pod when the ink runs out.
- Ink Care support
- Want extra peace of mind? Optional 1-Year Ink Care adds coverage for eligible cartridge issues and is available separately.
- Free HomeSpark App Included (No Subscription Required)
- The free app includes the open canvas, photo upload printing and everyday templates. Only some advanced AI design features use credits, and only when you choose them.
Free U.S. shippingDelivery details
- Shipping eligibility
- Ships from Los Angeles County, California. Eligible U.S. orders of $49 USD or more qualify for free shipping. Check the shipping policy for covered destinations.
- Tracking your order
- Tracking information is provided after shipment.
EdiBot CareInk care & support
- Ink Care
- Ink Care is available separately. Review the terms for coverage of eligible cartridge issues.
- Product assistance
- 1-Year Warranty & Free First Print Support Included
- Returns and refunds
- See the return policy for deadlines, eligibility and return shipping.
Product DescriptionPrint on cookies, cakes, latte art & coffee foam, macarons and marshmallows. View details Hide details
iKoffy EdiBot — Handheld Full-Color Edible Food & Cookie Printer
Print vibrant, 1200 DPI full-color photos, logos, drawings, and text directly onto cookies, cakes, latte art, coffee foam, macarons, and marshmallows in seconds. EdiBot is a portable, cordless handheld edible printer designed for home bakers, families, cafés, and event creators who want studio-quality custom treats without bulky desktop machines.
Turn your favorite moments into edible art.
Pair EdiBot with the free HomeSpark app (no subscription required) via Bluetooth to turn phone photos, kids' drawings, custom logos, messages, and AI-generated designs into full-color edible creations—from a child's artwork on a sugar cookie to a sweet message on morning latte foam, birthday desserts, and personalized party gifts.
Why Bakers, Families & Creators Choose EdiBot:
• Direct-to-Food Full-Color Printing (1200 DPI CMYK): Glide smoothly across royal icing cookies, plain cookies, macarons, marshmallows, fondant cakes, toast, and cappuccino foam for crisp, vivid detail in about 3 seconds.
• Portable, Wireless & Effortless: Weighing just 5.8 oz (165 g) with a rechargeable USB-C battery (2–3 hours runtime), this compact handheld food printer goes anywhere—from home kitchens to pop-up events, weddings, and cafés.
• Food-Grade Safe Edible Ink (FDA-Compliant & Kosher Certified): Powered by Orthodox Union (OU) Kosher-certified, FDA-compliant, GRAS-assessed CMYK edible ink—completely safe and tasteless on food.
• Ultra-Low Cost Per Print: Each Edible Ink Pod delivers ~3,000 large designs or 5,000+ small logos and names (roughly $0.02–$0.03 per cookie), making custom cookie decorating fast and affordable.
• Made for Family Time, Parties & Small Businesses: Create unforgettable holiday cookies with kids, print branded logos for cafés and corporate events, or turn everyday treats into personalized gifts.
Choose Your Set:
• EdiBot Starter Set: Includes 1 EdiBot handheld edible printer + 1 full-color CMYK Edible Ink Pod (~3,000–5,000 prints).
• EdiBot Creator Plus Set: Includes 1 EdiBot handheld edible printer + 2 full-color CMYK Edible Ink Pods (~6,000–10,000 prints)—ideal for frequent bakers, events, and gifting (save $10 vs. buying a spare $100 Ink Pod separately).
Swipe for more sections
Cookies Are Just the Beginning.
Watch EdiBot turn a child’s drawing into an edible topper for an 8-inch birthday cake.
- Print on an icing sheet
Use the Large-format Positioning Ruler (sold separately) to line up five rows for a maximum print area of about 12 × 15 cm (4.7 × 5.9 in.).
- Decorate an 8-inch cake
Trim around the printed drawing and center it on your frosted cake. Add a piped border or a few berries around the edges.
- What can EdiBot print on?
Latte foam, plain cookies, royal icing cookies, macarons, marshmallows, toast, tortillas, chocolate, and fondant cakes.
Print directly onto cookies, latte foam, marshmallows, macarons & fondant—no edible paper needed. For oversized 8-inch cake toppers, you can optionally print onto icing sheets with the Large-Format Positioning Ruler.
Create With HomeSpark.
A free app to create, edit, save and share, with or without EdiBot.
Supports current and previous EdiBot models and both Ink Pod types.
What Can You Print On?

Skeleton Marshmallows

Cakes

Coffee

Marshmallow Pops

Cookies

Marshmallows

Lollipops

Macarons

Cupcakes

Tortillas

Icing Sheets

Iced Cookies

- Cyan
- Magenta
- Yellow
- Black
CMYK edible ink
Is the ink safe?
Made with food-grade ingredients and tested by multiple laboratories, our CMYK edible inks are designed for printing directly onto food—so you can create with confidence.
-
Kosher certified
- Our edible inks are certified Kosher by the Orthodox Union (OU).
- FDA compliant
- Independently assessed
- An independent safety assessment supports Generally Recognized as Safe (GRAS) status for their intended use in food printing.
Ingredients & their roles
Explore the ingredients in our edible inks and the role each one plays.
| Ingredient | Amount (w/w) | Role in the ink |
|---|---|---|
| Water | 67% | The liquid base that carries the other ingredients. |
| Glycerol (glycerin) | 10% | Helps retain moisture and adjust the ink’s consistency. |
| Propylene glycol | 20% | Helps dissolve ingredients and retain moisture. |
| Polysorbate 20 | 1.2% | Helps ingredients mix and supports wetting and spreading. |
| Potassium sorbate | 0.1% | A preservative that helps limit microbial growth. |
| Citric acid | 0.5% | Adjusts the acidity of the ink. |
| Colorants | Approx. 1.2% | Provide the color used to create printed designs. |
How do I care for EdiBot after printing?
After each print, turn off EdiBot, then place it back on its base. Avoid leaving the printhead exposed to air for extended periods. This helps prevent ink from drying and clogging the printhead, which can affect your next print.
Frequently Asked Questions.
Is The Ink Made For Food?
Use only the compatible EdiBot edible Ink Pod and follow its labeling and supplied safety guidance.
What Surfaces Work Best?
Results are most consistent on flat, stable surfaces with enough room to move the printer. Use the compatibility section above for examples and limitations.
How Do I Begin A Design?
HomeSpark offers several ways to begin, including a blank canvas, ready artwork, a photographed drawing, or an occasion idea.
What Is HomeSpark?
HomeSpark is the creation workflow used to prepare, personalize, save, and reprint EdiBot designs.
How Should I Care For The Ink Pod?
Follow the approved installation, cleaning and storage guidance supplied with EdiBot.
What Does Ink Care Include?
Starter Set and Creator Plus Set do not include 1-Year Ink Care. It is available separately. View Ink Care details & terms.
What Comes With Each Set?
Starter Set includes one EdiBot and one full-color CMYK Ink Pod. Creator Plus Set includes one EdiBot and two full-color CMYK Ink Pods. Choose Green, Black or White. Neither set includes 1-Year Ink Care.
What About Shipping, Returns And Support?
Every set includes First Print Support. Review the store’s published shipping, duties, returns, and warranty policies before purchase.
Technical Specification

EdiBot Portable Food Printer

Ink Certification
- Kosher-Certified; FDA Compliance Documentation
Product specs
- Model: IP01
- Dimensions: 3.9 × 2.7 × 2.8 in (98.92 × 67.47 × 70.5 mm)
- Weight: 5.8 oz (165 g)
- Connectivity: Bluetooth LE 5
- Battery capacity: 550 mAh
- Charging: USB-C, DC 5 V / 0.5 A
- Working time: 2–3 hours per full charge
Software
- App: KitchQ HomeSpark
- Platforms: iOS and Android
- Design tools: Photo uploads, templates and AI image creation
Print specs
- Printing technology: Full-color edible ink printing
- Resolution: Up to 1200 DPI
- Single-pass width: Up to 0.92 in (23.3 mm)
- Multi-row printing: Up to 5 rows
- Image area: Approx. 4.7 × 5.9 in (12 × 15 cm)
Ink & materials
- Ink type: Food-grade CMYK edible ink
- Estimated yield per Ink Pod: about 3,000 large designs. Small names or logos can exceed 5,000, depending on design size and ink coverage.
- Shelf life: Up to 12 months unopened
- Surfaces: Smooth, fully dried royal icing, macaron shells and suitable edible paper
- For cakes: Print on edible paper, then cut and apply





